Set checkpoints for stages of the work

Section 5: For requesters · For requesters · Starter and above · 4 minute read

Checkpoints are dates before the deadline for stages of the work, such as an outline or a first draft. When a writer submits, they choose which checkpoint the submission is for. You then see, for each writer, which checkpoints they met and how early or late. This article shows how to set checkpoints, what writers do, how to read the result, and how to change checkpoints later.

Checkpoints are available on the Starter plan and above.

In education, writers are called students, the request is called an assignment, and the deadline is called the due date.

Set checkpoints when you create the request

  1. Click New Request + in the sidebar.
  2. Fill in the form, including the Deadline (see How do I create a request?, 5.2).
  3. Find Checkpoints.
  4. Click + Add checkpoint. A row appears.
  5. Type a name for the stage, for example "Outline".
  6. Choose a date. It must be before the deadline.
  7. To add another, click + Add checkpoint again. You can add up to five.
  8. To remove a row, click × on it.
  9. Finish the form and click Create request.

What writers do

Writers see the checkpoints with the request's details beside their editor.

When a writer reaches a stage, they submit their work as usual. When they click Submit, they choose which checkpoint the submission is for. Each submission is checked and gets its own report.

Each checkpoint submission is one of the writer's submissions on the request. A writer can submit once and resubmit up to 5 times, all covered by one verification. If your request has several checkpoints, those submissions count toward that total.

See who met each checkpoint

  1. Click My Requests in the sidebar.
  2. Open the request.
  3. Find Checkpoints.
  4. The section shows a grid: one row for each writer, one column for each checkpoint.
  5. Each square shows which submission the writer chose for that checkpoint, its date, and how far it was from the checkpoint's date, for example "Version 2 · 12 Nov (3 days early)".
  6. An empty square means the writer has not submitted for that checkpoint.

Change checkpoints later

You can change checkpoints at any time from the request's page.

  1. Click My Requests in the sidebar.
  2. Open the request.
  3. Find Checkpoints.
  4. To rename a checkpoint, change its name.
  5. To move a checkpoint, choose a new date before the deadline.
  6. To add a checkpoint, click + Add checkpoint, up to five in all.
  7. To remove a checkpoint, click × on its row.
  8. Save your changes.

A checkpoint that a writer has already submitted for can be renamed or moved, but not removed.

Choosing checkpoints

  • Use checkpoints for stages you want to see, such as an outline, a first draft and a final draft.
  • Space them so writers have time to work between them.
  • Keep the deadline for the final piece. A checkpoint is a stage along the way, not a second deadline.