Add a note about how you worked

Section 6: For writers · For writers · 4 minute read

The writer's note is a short note, in your own words, about how you wrote your document: where you researched, how you drafted, what you revised, and anything the reader should know. "It travels with your verification report." It is your chance to give context the report cannot, before anyone has to ask. This article shows how to write it, what to include, and what happens to it when you resubmit.

Write your note

  1. Open your document in the editor.
  2. In the toolbar, click Writer's note….
  3. A box opens.
  4. Type your note.
  5. Click Save.

You can write the note at any time before you submit, and change it later.

What to include

Write it as you would explain your process to the person reading your work. Useful things to mention:

  • Research. Where your ideas and information came from: books, articles, interviews, lectures.
  • Drafting. How you wrote it: in one sitting or over several days, starting from an outline, or writing freely first.
  • Revising. What you changed between drafts, and why.
  • Anything that may look unusual on your report. For example:
    • you pasted a quotation, or your own earlier notes;
    • you used dictation or an assistive tool;
    • you wrote part of it away from the editor and typed it in later;
    • there is a long gap between sittings.
  • Tools you used, if the request allowed them, and what for.

Keep it factual and short. A few sentences are usually enough.

Examples

I researched this over a week using the three readings from class and two articles from the library database. I drafted the introduction last, after the argument was clear. Between my first and second submissions I rewrote the conclusion following my instructor's comments.

I wrote my first draft by hand during a train journey and typed it into VeriPost that evening, so most of it was written in one sitting. The quotation in paragraph three is pasted and cited.

Where your note appears

Your note appears on your verification report, under your name. Anyone reading your report sees it alongside it.

When you resubmit

Your note carries over to your next submission. If your process has changed, for example you revised a section after feedback, update the note before you resubmit:

  1. Click Writer's note….
  2. Add what you changed, or rewrite the note.
  3. Click Save.
  4. Resubmit.

If you do not change it, the same note goes with your new submission.